Driveways
New and replacement driveways with thickened edges for truck traffic.
Get an estimate
Amarillo concrete contractor
Driveways, patios, sidewalks and shop slabs with proper base, rebar and control joints in every pour.
Tell us about the project. We'll measure for free.
Services
We tear out, form, pour and finish with our own crews.
New and replacement driveways with thickened edges for truck traffic.
Get an estimateBroom, stamped or exposed-aggregate patios with sealed finishes.
Get an estimateWalks, steps and ramps poured to code with slip-resistant finishes.
Get an estimateThick, reinforced slabs for shops, barns and RV pads.
Get an estimateSlab-on-grade foundations for homes, additions and outbuildings.
Talk to usCracked, sunken concrete removed and hauled off before the new pour.
Get an estimatePricing
Every project gets a free measure and a written, line-by-line quote.
4 to 5 inch reinforced slab on compacted base.
Includes forming, rebar and control joints.
Pattern and color of your choice, sealed after curing.
Heavier rebar grid and thickened edges for equipment.
Old concrete broken up and removed before the new pour.
Penetrating sealer that resists freeze-thaw and stains.
Sample pricing for this demo. Final price depends on access, thickness, tear-out and finish.

How it works
What you can't see, the base and the steel, decides how long concrete lasts.
We measure, check drainage and write a detailed quote.
Tear-out, grading, compacted base, forms and rebar.
4,000 PSI concrete placed, finished and jointed the same day.
Cured and sealed, ready for foot traffic in a day and cars in a week.
Panhandle freeze-thaw cycles crack thin, unreinforced concrete fast. We build for it.
Tore out our cracked driveway and poured a new one in two days. They even re-graded so water runs to the street.
Stamped patio looks like real stone. The crew left the yard spotless.
Shop slab is solid and level. Rain delayed the pour twice, but they kept me updated.
A quick Google review helps neighbors find a contractor they can trust. It takes about a minute.
Demo: links to the business's Google review form once connected.
Questions
Still have a question? Call (806) 555-0108.
Walk on it after 24 hours and drive on it after 7 days. Heavy trucks should wait 28 days.
All concrete can crack. Rebar, a compacted base and control joints keep cracks small and where we want them.
Yes, above freezing with blankets and accelerators. We won't pour when overnight lows threaten the slab.
Yes, where Amarillo requires them, such as driveway approaches and foundations.
Broom is cheaper and grippier. Stamped looks like stone or brick and needs resealing every few years.
Find us
Free measure and a written quote this week.